Skip to main content
Bid Intake

Send Us
Plans for Bid.

Upload drawings, specs, and bid-date info. ACG reviews the Division 08 scope, flags system conflicts, and returns a detailed proposal or budget direction. Standard commercial turnaround: 48 hours.

Home / Send Plans
350+
Projects Completed
3
Florida Offices
48 HR
Bid Turnaround
Full Division 08
Glazing Scope
What Happens Next

A 3-step process. No ambiguity.

STEP 01

Submit Plans

Upload drawings, specs, and bid-date info using the form below. Accepts PDF, DWG, ZIP, and Office file formats.

STEP 02

ACG Reviews Scope

Our estimating team reviews your drawings, identifies the Division 08 scope, flags system conflicts, and confirms NOA / HVHZ requirements.

STEP 03

Proposal Delivered

Detailed scoped proposal or budget direction returned within 48 hours for standard commercial projects. If we need clarification, we call you direct.

Plan Submission

Send plans. Get a scope.

The more info you share, the faster we scope. Required fields are marked. File uploads accept up to 25 MB total.

Your Contact
The Project
Scope Needed

Check all that apply.

Bid Type
Drawings / Specs
Notes
Or email plans to [email protected]
FAQ

Before you send it over.

What's the real turnaround on a scoped proposal? +

48 hours on standard commercial projects. For complex curtainwall or multi-building scopes, 72-96 hours. If it's going to take longer, we tell you within 24 hours of receiving the plans.

What file size limit? +

25 MB total through the form. If your drawing set is bigger, share a Procore, BuildingConnected, or BIM 360 link in the Notes field, or email it to [email protected] and reference the form submission.

Budget pricing vs full hard bid — which do I pick? +

Pick Budget Pricing for pre-DD / schematic projects to get a working number. Pick Full Bid when you have CDs and a real bid due date. VE Alternate is when you already have a number and want a second look to value-engineer the glazing package.

Do you bid jobs outside Florida? +

Florida only for install. Supply-only arrangements are possible on certain manufacturer packages (ESWindows, Euro-Wall) for out-of-state GCs. Submit the form and we'll tell you on the call.

Preferred plan format? +

PDF drawings with an elevation sheet and a door/window schedule is ideal. Full CD set in PDF works. DWG files accepted. If there's a spec section 08, include it; we'll read it cover-to-cover.

ACG

One glazing sub.
Every opening.

Florida commercial glazing. 350+ projects. 48-hour bids. Built for general contractors.

View Portfolio About ACG